SK hynix received approval of its final site layout and paving plans. This approval confirms that the project’s proposed stormwater and drainage design meets County requirements. It is an essential step in the pre-construction process and must occur before the City can issue construction permits.
This action specifically addressed:
- Encroachment within the John Boes regulated drain
- Stormwater improvements related to the full buildout of the 130-acre site
City Note: Site plans were submitted with an additional east entrance off Kalberer Road that was not approved at the foundation permit stage.
Date of Approval: 1/07/2026
Reviewing Entity: Tippecanoe County Drainage Board